AI Application Drafter

IDC Green Economy Facility — Brightpath Engineering (Pty) Ltd

Generating draft…

Selected Grant

IDC Green Economy Facility

Max amount R 500 000
Match score 79%
Deadline 2025/10/31

Organisation Profile

Name Brightpath Engineering (Pty) Ltd
Sector Manufacturing / Precision Engineering
Province Gauteng
Employees 23 full-time
Annual turnover R 2.1M
B-BBEE Level Level 2
Registration CIPC confirmed
Tax clearance Current

Project Objectives

— Retrofit two CNC machining lines with energy-efficient servo motors

— Reduce electricity consumption by approximately 38%

— Meet carbon-reduction requirements of anchor clients

— Create 4 additional full-time positions in Year 2

Draft progress

65% complete
Cover page Project description Budget motivation Impact statement Supporting documents

Project Description

Brightpath Engineering delivers precision metal fabrication services to infrastructure contractors across Gauteng and Limpopo. Founded in 2019, the enterprise employs 23 people, 74% of whom are from surrounding communities in Tembisa and Ivory Park.

The requested IDC Green Economy facility of R 500 000 will be deployed over 18 months to retrofit two CNC machining lines with energy-efficient servo motors, reducing electricity consumption by an estimated 38% and enabling the enterprise to meet the carbon-reduction requirements of its two largest clients, both of which operate under Scope 3 emissions reporting obligations.

The intervention will preserve all 23 existing positions and create an additional four roles in Year 2 as increased production capacity is released by the efficiency gains. Brightpath Engineering is tax compliant, CIPC registered, and holds a current B-BBEE Level 2 certificate from an accredited verification agency.

Budget Motivation

Servo motor retrofit — Line 1 (Mazak QTN 300M) R 185 000
Servo motor retrofit — Line 2 (Doosan Lynx 220) R 165 000
Installation and commissioning (certified electricians) R 65 000
Energy audit and monitoring equipment R 45 000
Operator training and certification R 25 000
Contingency (3%) R 15 000
Total R 500 000

Generating: Impact Statement